What is Dry-docking and also why do we do it?
The procedure of dry-docking refers to when a vessel is taken to the solution yard and also gave dry land so that immersed parts of the hull can be cleansed and examined. This work is both preventative in addition to a regulative demand within the market. When pre-owned acquired vessels are due for dry-docking, they are rebranded and assessed to meet all Teekay requirements.

At Teekay, vessels are set up for dry-docking as soon as every 5 years, with intermediate studies happening in between. As soon as the vessels are returned right into service, they are much more green and fuel-efficient. At its core, the process of dry-docking has to do with our commitment to Functional Management as well as our pledge to operate the best ships in the market.
Layup Anchorage Malaysia

If the globe of dry-docking had one moto, it would be “plan, plan, strategy and prepare some more.”

In 2015, the Teekay Tankers team finished the largest dry-docking program to date, successfully refining 17 vessels over the course of 382 days of service time. The procedure itself requires mindful planning and preparation. Every minute information needs to be taken into account when taking on a major task such as the dry-docking of a vessel– as well as even more so when attempting to work with 17 of them in a year.

So what does the actual dry-docking procedure involve? Let’s have a look:

 

Arrival at Lawn and Going Into the Dry-dock
After finishing all necessary primary work, the vessel gets to the shipyard. On completion of port formalities, the vessel proceeds to the dry-dock with assistance from pull watercrafts and also shipyard personnel. Prior to this, the blocks are organized by the shipyards based on each vessel’s details docking strategy.

Pumping Down the Dock and also Vessel “Taking” the Blocks
The water is drained from the dry-dock (typically over night) throughout regarding 8 to ten hrs, depending on the dimension of the vessel. Before the vessel is rested on the block, specialized dive teams make certain the block structures remain in the appropriate location.

Varying the Cables
The cables (or anchor chains) are ranged on the dock base once the dock is completely dry. Supports as well as cable televisions are then evaluated and determined to determine the quality/ problem as well as malfunctioning parts are repaired or changed as called for.


Hull Paint
The hull paint contains washing, blowing up and also paint of the vessel as well as is among the main reasons for dry-docking, as it makes certain efficient vessel operations for the next five years. After extended Layup Anchorage Malaysia durations of cruising as well as service, it is not uncommon for marine growth such as algae or sludge to build up on the sides of the vessel. This build-up has a straight influence on the performance of the vessel and also eventually causes higher gas intake.

LAUNDERING
Shipyard employees use (fresh water) high-pressure washing machines to get rid of aquatic development and chlorides from the ship side.

BLASTING
Blasting is done largely to get rid of rust or malfunctioning paint from the ship side. Relying on the requirement of each vessel, blowing up might be local or accomplished along the entire side of the vessel. In this procedure, old paint in the defective areas is gotten rid of totally to subject the bare steel.

PAINT
Once the blasting is finished, the whole vessel is cleaned and painted to shield the stability of the steel as well as protect against future rust. The undersea side is painted with anti-fouling paint to stop aquatic development and makes sure vessel operates close to its original layout rate as well as fuel consumption.

Opening Sea Chests and also Overhaul of Sea Valves
The sea chest is a recess in the hull of the ship that provides intake of sea water for the air conditioning systems in the engine space. This area is opened throughout the dry-docking process for cleaning, inspecting and also painting. At the same time, all ship-side sea valves are examined and also upgraded as called for.

Needed Repair Works and also Maintenance
Throughout this Layup Anchorage Malaysia period, groups take the opportunity to carry our upkeep work on engines, pumps, tanks and also cargo spaces as required. Repairs on the rudder, propeller or shafting are made if any kind of problems are identified.

Swamping the Dock
Nevertheless intended job has actually been adequately finished, the dock is swamped and prepared for the vessel’s departure.

Separation as well as Trials
The vessel is lugged out of the dry-dock with the assistance of yanks and shipyard employees. Once the vessel gets to a safe anchorage area, sea trails are executed to confirm the procedure of all ship’s equipment. On completion of sea tests, the vessel is commissioned back right into service.